Widening I-95 between I-295 and Butler to 10 lanes.

Started by Megabox, Yesterday at 09:56:23 AM

Megabox

I have read an article that says the I-95 will be widened from 6 to 10 lanes between I-295 and Butler. There are also plans to make the Baymeadows Rd interchange a diverging diamond.

thelakelander

Yes, they are peicemealing the widening of I-95 between World Golf Village and Atlantic Blvd. I recall a PD&E being done years ago.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

Megabox

I'm guessing that the pedestrian overpass over I-95 will be replaced once I-95 gets widened in that area.

Charles Hunter

As thelakelander said, FDOT divided is piecemealing the widening of I-95 between the First Coast Expressway in St Johns County, and Atlantic Blvd. (just south of the Fuller Warren Bridge).

The pieces between JTB and Atlantic are under construction now.

The next piece south, between Baymeadows and JTB is a "Design/Build" project - which means the same team does final engineering and construction. Design is underway and construction is scheduled to start in FY30 (July 2029-June 2030). There is $80 million the the TIP for this 2.2 mile project.

Construction of the I-295 to Baymeadows piece does not appear to be scheduled within the current TIP or FDOT Work Program, which go through FY31.


jaxlongtimer

#4
FDOT is overdue, I believe, on starting the rebuild of I-95 between I-10 and Beaver/Union.  Haven't seen any updates. 

I-95 is a cluster.  I-10 and I-295 aren't any better.  Accidents, construction... lane closures and back ups constantly, even when nothing is wrong.  I avoid them as much as possible.  Local roads are more reliable and, thus, ultimately, faster.  Jacksonville will be L.A. East one day soon.

Charles Hunter

Quote from: jaxlongtimer on <strong>Yesterday</strong> at 06:33:44 PMFDOT is overdue, I believe, on starting the rebuild of I-95 between I-10 and Beaver/Union.  Haven't seen any updates. 

I-95 is a cluster.  I-10 and I-295 aren't any better.  Accidents, construction... lane closures and back ups constantly, even when nothing is wrong.  I avoid them as much as possible.  Local roads are more reliable and, thus, ultimately, faster.  Jacksonville will be L.A. East one day soon.

Good News, jaxlongtime, construction could start next year.
In FDOT-speak, it is project number 442778-1. The Work Program has $381 Million programmed in FY27 (the FDOT fiscal year 2027 started July 1, 2026), of which nearly $332 Million for Design-Build.
This page, from the FDOT site Northeast Florida Roads (NFLROADS.COM), has maps and other info about the project:
https://nflroads.com/ProjectDetails.aspx?p=5481

From a presentation by FDOT, the general plan is to widen the newer bridges (the ones outside the silver bridge over the rail yard), adding one lane in each direction. This will include some widening, but mostly by reducing the width of the paved shoulders to restripe the lanes. Once that is done, they will shut down the center portion to replace the deck and do structural work on the silver bridge. From the same FDOT page, the presentation from their December 2024 public meeting - https://nflroads.com/ProjectFiles/5481/44277812201-CE2-D2-PubHearingPres_InPerson_2024-11-26_LowRes.pdf