Widening I-95 between I-295 and Butler to 10 lanes.

Started by Megabox, November 14, 2026, 09:56:23 AM

Megabox

I have read an article that says the I-95 will be widened from 6 to 10 lanes between I-295 and Butler. There are also plans to make the Baymeadows Rd interchange a diverging diamond.

thelakelander

Yes, they are peicemealing the widening of I-95 between World Golf Village and Atlantic Blvd. I recall a PD&E being done years ago.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

Megabox

I'm guessing that the pedestrian overpass over I-95 will be replaced once I-95 gets widened in that area.

Charles Hunter

As thelakelander said, FDOT divided is piecemealing the widening of I-95 between the First Coast Expressway in St Johns County, and Atlantic Blvd. (just south of the Fuller Warren Bridge).

The pieces between JTB and Atlantic are under construction now.

The next piece south, between Baymeadows and JTB is a "Design/Build" project - which means the same team does final engineering and construction. Design is underway and construction is scheduled to start in FY30 (July 2029-June 2030). There is $80 million the the TIP for this 2.2 mile project.

Construction of the I-295 to Baymeadows piece does not appear to be scheduled within the current TIP or FDOT Work Program, which go through FY31.


jaxlongtimer

#4
FDOT is overdue, I believe, on starting the rebuild of I-95 between I-10 and Beaver/Union.  Haven't seen any updates. 

I-95 is a cluster.  I-10 and I-295 aren't any better.  Accidents, construction... lane closures and back ups constantly, even when nothing is wrong.  I avoid them as much as possible.  Local roads are more reliable and, thus, ultimately, faster.  Jacksonville will be L.A. East one day soon.

Charles Hunter

Quote from: jaxlongtimer on November 14, 2026, 06:33:44 PMFDOT is overdue, I believe, on starting the rebuild of I-95 between I-10 and Beaver/Union.  Haven't seen any updates. 

I-95 is a cluster.  I-10 and I-295 aren't any better.  Accidents, construction... lane closures and back ups constantly, even when nothing is wrong.  I avoid them as much as possible.  Local roads are more reliable and, thus, ultimately, faster.  Jacksonville will be L.A. East one day soon.

Good News, jaxlongtime, construction could start next year.
In FDOT-speak, it is project number 442778-1. The Work Program has $381 Million programmed in FY27 (the FDOT fiscal year 2027 started July 1, 2026), of which nearly $332 Million for Design-Build.
This page, from the FDOT site Northeast Florida Roads (NFLROADS.COM), has maps and other info about the project:
https://nflroads.com/ProjectDetails.aspx?p=5481

From a presentation by FDOT, the general plan is to widen the newer bridges (the ones outside the silver bridge over the rail yard), adding one lane in each direction. This will include some widening, but mostly by reducing the width of the paved shoulders to restripe the lanes. Once that is done, they will shut down the center portion to replace the deck and do structural work on the silver bridge. From the same FDOT page, the presentation from their December 2024 public meeting - https://nflroads.com/ProjectFiles/5481/44277812201-CE2-D2-PubHearingPres_InPerson_2024-11-26_LowRes.pdf

Steve

Quote from: Charles Hunter on November 14, 2026, 12:04:28 PMThe pieces between JTB and Atlantic are under construction now.

Only half of this is - From Atlantic to just before the Spring Park Road Overpass (between Emerson and University). From there to JTB hasn't started and is being done separately it seems.

Jagsdrew

It's frustrating in a way that we just doing chunks of projects rather than all of it at the same time. A lot of our metro major arteries have deteriorated over the last 15 years and FDOT is not addressing it all the while central and south Florida are receiving all the major roadwork projects plus the aesthetics to compliment the project. All of our proposed or in-flight projects are just bare bones to get the level of service up from D or F grade to B or higher. Expect I-95 to be under construction thru 2035.
Twitter: @Jagsdrew

thelakelander

We have to demand more out of our FDOT District when it comes to aesthetics. The precedent is there statewide, but if we're not consistent with pushing for more, it won't happen. The Fuller Warren Bridge shared use path is a good example of this.

As far as piecemealing road projects, that will always be the case. There's a big economy built around it. Even in Central Florida, the I-4 Ultimate was name only. The I-4 Beyond the Ultimate work is going on now.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

Charles Hunter

Quote from: Steve on <strong>Today</strong> at 08:38:58 AM
Quote from: Charles Hunter on November 14, 2026, 12:04:28 PMThe pieces between JTB and Atlantic are under construction now.

Only half of this is - From Atlantic to just before the Spring Park Road Overpass (between Emerson and University). From there to JTB hasn't started and is being done separately it seems.

Thanks for the correction. I don't get over there often and thought it was already underway. According to the FDOT Work Program site (https://fdotewp1.dot.state.fl.us/FMSupportApps/WorkProgram/Support/WPItemRept.aspx?RF=WP&IT=432259&IS=3&RP=SCHD ), it will be another year (late 2027) before work starts between Bowden and Emerson. I think the I-295 to JTB project actually extends to the Bowden Road ramps.


Quote from: thelakelander on <strong>Today</strong> at 08:49:08 AMWe have to demand more out of our FDOT District when it comes to aesthetics. The precedent is there statewide, but if we're not consistent with pushing for more, it won't happen. The Fuller Warren Bridge shared use path is a good example of this.

As far as piecemealing road projects, that will always be the case. There's a big economy built around it. Even in Central Florida, the I-4 Ultimate was name only. The I-4 Beyond the Ultimate work is going on now.

Looking at the cost of these projects, there's no way any District could get sufficient funds in a single allocation to a long project, like I-295 to Atlantic. Thus, they are done in short pieces.

The local FDOT office (District 2) programs the money allocated to them by the headquarters in Tallahassee. These allocations are based, in part, on formulas, as well as subjective factors. As with any government agency, those subjective factors are influenced politically. If we want District 2 to have more money to meet our needs, our Legislative delegation needs to have more influence. This has been the case for many years. One tactic of District 2 is to get plans for major and minor projects "shovel ready" in case another District cannot use all of their funding allocation.

Similarly on District 2's lack of aesthetics. The District 2 Secretary seems to have a very low priority on how projects look. Again, as appointed officials (by the FDOT State Secretary) they can be sensitive to political pressure. If elected officials from the Jacksonville metro and Alachua/Gainesville expressed a strong demand for better aesthetics, FDOT just might respond favorably.

While those 'pretty' sound walls in other parts of the state are more expensive than the plain ones here, they are a very small percentage of the total cost of Interstate projects.



jaxlongtimer

Jacksonville, in general, has never dwelled much on aesthetics and it bleeds through our entire environment from building architecture, historical preservation, landscaping, parks/greenscapes, streetscaping, infrastructure design (e.g. bridges over the river), etc.  Jacksonville historically has been all about cutting costs, moving fast, making a quick buck for special interests and pandering to the lowest common denominator.  Some progress in recent years but so far to go.