Downtown Construction Update - September 2009

Started by Metro Jacksonville, September 10, 2009, 06:06:01 AM

Metro Jacksonville

Downtown Construction Update - September 2009



A look at the status of various projects under construction in and around Downtown Jacksonville during the month of September.

Full Article
http://www.metrojacksonville.com/article/2009-sep-downtown-construction-update-september-2009

Keith-N-Jax

Hmmm I could use some of those pavers. I wonder if they mind if I get a few.

riverside_mail

There was some interior work being done last week at John Gorrie, but nothing noticeable.

vicupstate

"The problem with quotes on the internet is you can never be certain they're authentic." - Abraham Lincoln

reednavy

If I'm not mistaken, Philosophie in San Marco has been open well over a year. Maybe they relocated?
Jacksonville: We're not vertically challenged, just horizontally gifted!

fsujax

Gotta love those mast arm poles along Bay St. and to think people will try to complain about a small overhead wire for a streetcar.

thelakelander

Quote from: vicupstate on September 10, 2009, 07:35:57 AM
Where in Springfied is Fusion going exactly?

the two story brick building on Pearl Street, just north of 8th.  Its where Draper Studios used to be located.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

thelakelander

fsujax, you're right.  Well at least we now have an example to show what it will not look like.
"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

Captain Zissou

It's not on a main thoroughfare, but there is a sizable building (6000 sft +) going in on Herschel just east of King Street.  It's right across from the RAP headquarters.  It will be the future home of an engineering company.  Looks like it will fit the neighborhood well.

Can't wait to try Taverna.  Why do we still not know what 925 King St is??????

DavidWilliams

What is going in the former Casablanca space or is that still TBD?

fsu813

Fusion Jazz & Wine Bar -

wow, i didn't know anything like that was in the works. i hope it works out, though i have my doubts in that location. it looks like they are pretty far along. they need to create some buzz........

also,

what is "The Oasis"?

thelakelander

"A man who views the world the same at 50 as he did at 20 has wasted 30 years of his life." - Muhammad Ali

heights unknown

Springfield sure looks great; it's progressing quite nicely and for the better.  Much different than I remember it in the 1980's and early 1990's.  

Great seeing those cranes up on the Courthouse site and construction moving the project skyward.

How much longer are they going to be working on Main Street in Springfield?  Looks like they've been doing the street construction forever now.

Heights Unknown
PLEASE FEEL FREE TO ACCESS MY ONLINE PERSONAL PAGE AT: https://www.instagram.com/garrybcoston/ or, access my Social Service national/world-wide page if you love supporting charities/social entities at: http://www.freshstartsocialservices.com and thank you!!!

Atari007

925 King St... that was the old laundry mat, right?  When they closed, I heard that it was only supposed to be for a few months tops so that they could do renovations and whatnot.  Two years or so later............... i dunno.

Any word on if anything is going to be moving into the 9th and Main building??  Its sad to see that place empty.....

Captain Zissou

Seriously? Check thread entitled "9th & Main...etc"