http://northfloridatpo.com/images/uploads/general/Adopted%20Needs%20Plan.pdf
It includes a project consisting of widening I-95 to 8 lanes from International Golf Pkwy to I-295.
This is outdated. We have a 2040 LRTP now:
http://northfloridatpo.com/planning-studies/lrtp/
Also, the needs list is a wish list that will probably never happen because there's no funding for those projects.
The more realistic projects that will happen over that timeframe are in the 2040 Cost Feasible Plan:
https://issuu.com/northfloridatpo/docs/tech_memo__10_-_cost_feasible_plan?e=19110718/30156237
The 2040 cost feasible plan includes widening Old St. Augustine Rd to 6 lanes from Loretto Rd/Greenland Rd to I-295. Hasn't that already been done a while ago? Last time I was on Old St. Augustine Rd it seemed like it was that wide between I-295 and Loretto/Greenland Rd.