Metro Jacksonville

Community => Transportation, Mass Transit & Infrastructure => Topic started by: Metro Jacksonville on March 07, 2012, 03:01:41 AM

Title: Major Urban Interchange Project Underway
Post by: Metro Jacksonville on March 07, 2012, 03:01:41 AM
Major Urban Interchange Project Underway

(http://photos.metrojacksonville.com/photos/1734505316_xgw53WQ-600x1000.jpg)

Construction is underway on the long proposed Martin Luther King, Jr. Parkway/21st Street interchange just north of downtown Jacksonville.

Full Article
http://www.metrojacksonville.com/article/2012-mar-major-urban-interchange-project-underway
Title: Re: Major Urban Interchange Project Underway
Post by: Noone on March 07, 2012, 03:14:21 AM
That explains all the buildings coming down. Do you happen to have any before and after pics?
Title: Re: Major Urban Interchange Project Underway
Post by: Garden guy on March 07, 2012, 06:51:14 AM
Maybe this will help the Pheonix ave area from the damage from trucks headed to tallyrand.
Title: Re: Major Urban Interchange Project Underway
Post by: thelakelander on March 07, 2012, 07:15:34 AM
Pheonix's truck traffic probably comes from the industries straddling the CSX and NS rail lines paralleling the street between 8th and 27th Streets.  Port related traffic in the area traditionally has used either 8th or 21st Streets to get to MLK/I-95.
Title: Re: Major Urban Interchange Project Underway
Post by: JeffreyS on March 07, 2012, 07:15:37 AM
I will sign a petition to include pedestrian connectivity in this project perhaps MJ could illustrate some suggestions.
Title: Re: Major Urban Interchange Project Underway
Post by: thelakelander on March 07, 2012, 07:22:04 AM
I think they screwed the pooch by locating those two ponds on both sides of 21st Street instead of the isolated green spaces between the ramps.  It's under construction now, so unfortunately, its probably too late for that particular stretch of 21st Street.  Thus, I'd probably focus on the areas surrounding it.
Title: Re: Major Urban Interchange Project Underway
Post by: Bativac on March 07, 2012, 07:32:48 AM
Well, hey, at least more buildings are being torn down. That's always good, right?
Title: Re: Major Urban Interchange Project Underway
Post by: tufsu1 on March 07, 2012, 07:48:54 AM
this project has been a desire of the port for probably 20 years...too bad the need isn't really there, since Tallyrand isn't where their growth is going to be.
Title: Re: Major Urban Interchange Project Underway
Post by: Lunican on March 09, 2012, 10:25:50 AM
It looks like this project only eliminates one traffic light between MLK and JAXPORT. $30.5 million.
Title: Re: Major Urban Interchange Project Underway
Post by: cline on March 09, 2012, 10:39:38 AM
Unfortunately, anything remotely questioning JAXPORT in this City is akin to blasphemy.